Hochpürschtling, Austria

Hochpürschtling Wind Farm was commissioned in 2013, the building and erection phase having extended over two summer periods. Because it is situated at 1,500 meters above sea level it can only be supplied using automatically controlled special equipment in the summer months. The site also places high demands on operation and service, which Senvion has fulfilled by designing procedures specially for the project.