REpower crosses historic 1 GW milestone in UK

Hamburg/Edinburgh, 10. April 2013: REpower Systems SE, a leading manufacturer of onshore and offshore wind turbines, has reached the historic milestone of 1 gigawatt (GW) installed capacity across UK wind farms. REpower UK is only the third manufacturer in the UK to achieve the 1 GW watershed.

Since REpower UK reached 500 MW installed capacity back in 2010, the manufacturer has added a substantial number of wind farms to its portfolio in England, Scotland and Wales. These include the Penny Hill wind farm developed by Banks Renewables which features six 3.4M104 turbines and was the project that took REpower UK to 1 GW. 3.4M104 is currently the company’s most powerful onshore wind turbine, and is the most powerful onshore turbine to be installed and operate in the UK.

Rick Eggleston, Managing Director of REpower UK says: “We are delighted to reach the historic milestone of 1 GW of installed capacity in the UK. We believe this is testament to the quality and reliability of REpower’s turbine technology which is ideally suited to UK wind conditions both onshore and offshore. We are committed to developing our market share and installed base in the UK wind power sector, and to building further on the successful relationships we have developed since we installed our first turbine in the UK in 2005.”

Andreas Nauen, CEO of REpower Systems SE comments: “Reaching 1 GW of installed capacity emphasises the UK as one of REpower’s core markets for our onshore and offshore business.”

REpower crosses historic 1 GW milestone in UK (PDF, 146 kByte)